Cape May Marina Wave Break
Cape May, New Jersey
A private marina in Cape May, NJ need to replace their damaged floating wave break. MCS work with the contractor to determine the best materials. MCS imported greenheart lumber and piles to build the new wave break.
Avalon Marina
Avalon, NJ
Improvements to both marinas infrastructure
Increase ability to maintain and lift more and bigger boats
30 ton travel lifts
Supply List:
Large Greenheart piles
Greenheart timbers for cross braces
Heavy duty HDG hardware
Stone Harbor, Marina and Breakwater
Stone harbor, NJ
Stone Harbor's town marina needed a new breakwater to improve the experience for boaters at the marina. MCS supplied the contractor with the marine construction materials to get the job done.
MCS Supply List:
Greenheart Pilings
Greenheart Dimensional Lumber
HDG Hardware
Spring Garden Marina
Millville, NJ
Improvements to both marinas infrastructure
Increase ability to maintain and lift more and bigger boats
30 ton travel lifts
Supply List:
Large Greenheart piles
Greenheart timbers for cross braces
Heavy duty HDG hardware
Wildwood Pump Station
Wildwood, NJ
Super storm Sandy caused much devastation in the area of Wildwood, New Jersey. A new pump station was being built as one of the coastal upgrades after the storm. The contractor needed 45' class B cca piles to use as the foundation of the structure.
Supply List:
Treated Timber Round Piles
Residential Foundations
Brick Township, NJ
After Super Storm Sandy, many houses needed to be rebuilt, some from the very foundations. Much of that work still continues today. MCS has worked to provide many residential projects along the coast with the materials to start again.
Materials Supplied by MCS in the foundation construction:
CCA Treated Piles
Dimensional Lumber
Manasqun River Yacht Club
New Jersey, USA
This private club upgraded their deteriorating bulkheads with the help of qualified contractors. MCS helped supply materials used on this coastal protection structure.
Supply List:
Piling
Hardware